Fresh footprints on the Moon aren't likely to happen in 2025 as NASA hoped. A new report warns of significant delays to the Artemis 3 mission, the result of two key contractors--SpaceX and Axiom Space--not being able to deliver the goods on time.
Fresh footprints on the Moon aren't likely to happen in 2025 as NASA hoped. A new report warns of significant delays to the Artemis 3 mission, the result of two key contractors--SpaceX and Axiom Space--not being able to deliver the goods on time.